Christian, T and Lars, H (2011) Efficient on-site construction: learning points from a German platform for housing. Construction Innovation, 11(03), 338–55.

Jason, U and Umit, I (2011) Emerging technologies for BIM 2.0. Construction Innovation, 11(03), 252–8.

Jay Na, L and Frank, P (2011) Innovation performance of construction enterprises: An empirical assessment of the German and Singapore construction enterprises. Construction Innovation, 11(03), 282–304.

Leila, H, Zeeshan, A and Feniosky, P-M (2011) Visualizing greenhouse gas emissions from construction activities. Construction Innovation, 11(03), 356–70.

Omar, A L T and Rifat, R (2011) General framework for designing multi-use simulation modules for estimating project durations. Construction Innovation, 11(03), 321–37.

Patrick, T I L and Franky, W H W (2011) A comparative study of buildability perspectives between clients, consultants and contractors. Construction Innovation, 11(03), 305–20.

  • Type: Journal Article
  • Keywords: buildability assessment model; construction systems; design; stakeholders
  • ISBN/ISSN: 1471-4175
  • URL: https://doi.org/10.1108/14714171111149025
  • Abstract:
    Purpose – This paper aims to highlight the similarities and differences in the buildability perspectives held by the client and the design team (collectively known as the design decision-making group) and the contractor (known as the execution group). Design/methodology/approach – Buildability attributes were identified through a questionnaire survey, followed by factor analysis to consolidate them into nine buildability factors. These were then presented to 31 construction experts (comprising clients, consultants and contractors), who ranked the buildability factors in association with common construction systems using the analytical hierarchy process. Findings – Whilst the consensus was on “enabling design requirements to be easily visualised and co-ordinated by site staff” to make designs buildable, clients and design teams differed from contractors in perspectives such as overcoming site restrictions, achieving standardisation and flexibility. When applied to construction systems, clients and design teams ranked precast systems higher than contractors, who favoured in situ systems. Research limitations/implications – Since the research was conducted in Hong Kong, the interpretation of the findings should be based on this contextual background as described in the paper. Originality/value – This paper highlights the common and different perspectives of the design decision-making group and the execution group in evaluating buildability and the reasons underlying their decisions. It paves the way for meaningful benchmarking of an important attribute affecting all construction stakeholders. The results form part of the development of a Buildability Assessment Model for use in Hong Kong, which is a useful tool for benchmarking buildability of designs, as in other countries (e.g. Singapore) which see the benefits of this important attribute on project performance.

Yuan, F and Ng, S T (2011) Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation, 11(03), 259–81.